Skip to main content
News

Start Of Lounge Operations at The Newly Built VIP Terminal Building

  • 2022-01-07

Today at 0600hrs Maldives Airports Company Ltd have started Maamahi Executive Lounge operations at the newly developed phase 1 of the VIP Terminal building at Velana International Airport.

 

The new VIP Terminal building comes with serene elegance providing spacious areas for our customers who can enjoy scenic beauty from both Landside and Airside. Along with wide F&B area and Duty-Free Shopping experience we are enhancing our services to our customers.

 

The new VIP Terminal Building concept was done by the world-renowned Architect Yuji Yamazaki and the detail design was done by AECOM. The new 4 story VIP Terminal building is being developed as a two-phase project by one of the leading construction companies in China: Beijing Urban Construction Group (BUCG). In phase 1, ground floor is dedicated to the VVIP services while 1st and 2nd floor is dedicated to VIP and CIP services consecutively.

 

The newly developed phase 1 is approximately 3,200 square meters and once the total project is completed it would provide 6,800 square meters of space against the old building which is 670 square meters.
 
The 2nd phase construction works for the new VIP Terminal development is scheduled to start in early 2022.
 

CATEGORY
COUNTRY / AREA
Maldives
AUTHOR
Maldives Airports Company Ltd
WAGA, ACI Annual assembly, conference, exhibition, aviation conference. ACI World, Riyadh Airports
The Trinity Forum 2024, The Moodie Davitt Report, Ho Chi Minh City, Travel, Luxury, IPP Travel Retail
Airport Carbon Accreditation
WAGA, ACI Annual assembly, conference, exhibition, aviation conference. ACI World, Riyadh Airports
Airport Carbon Accreditation
The Trinity Forum 2024, The Moodie Davitt Report, Ho Chi Minh City, Travel, Luxury, IPP Travel Retail